A Leader In Mass Transfer Tower Packing Since 1988. - JIANGXI KELLEY CHEMICAL PACKING CO., LTD

Short Lead Time for Tower Packing - Carbon & Graphite Raschig Ring for tower packing – Kelley


Product Detail

Product Tags

Related Video

Feedback (2)

Assume full responsibility to satisfy all needs of our clients; achieve continual advancements by endorsing the expansion of our purchasers; turn into the final permanent cooperative partner of clientele and maximize the interests of clients for 316l Super Raschig Ring , Rto Ceramic Saddle , 2inch Super Intalox Saddle , The principle of our company is to provide high-quality products, professional service, and honest communication. Welcome all friends to place trial order for creating a long-term business relationship.
Short Lead Time for Tower Packing - Carbon & Graphite Raschig Ring for tower packing – Kelley Detail:

Application

Carbon / Graphite raschig ring packing main gas absorption, acidic gas desorption, washing and chemical fertilizer production, the actual application occasions, also as a filler in propane stripping tower and acid gas used in the absorber, such as ammonium, reforming furnace, the tower of petrochemical equipment, purification of the corrosive materials, absorption, condensation, distillation, evaporation, filtration, washing device used in industries such as strong corrosion.

Carbon/Graphite Raschig Ring Features

with low pressure drop, large flux, uniform liquid distribution, high mass transfer efficiency, absorption of a variety of tail gas or used in washing,gas separation, etc.It instead of a large number of black metal and various non-ferrous metals, is a kind of excellent corrosion resistance of non-metallic materials.

Component Content

Main content of our carbon Raschig ring:

ITEM

UNIT

VALUE

Carbon content

%

88-92

Solid hydrogen and oxygen

%

6-10

Ash content

%

1

Others

%

1

Technical Data

Size    (mm)

D*H*T              (mm)

Bulk Density     (KG/M3)

Surface Area        (m2/m3)

Voidage        (%)

Number
per m3    (Pcs/M3)         

Φ19

19×19×3

650

220

73

109122

Φ25

25×25×4.5

650

160

70

47675

Φ38

38×38×6

640

115

69

13700

Φ40

40×40×6

600

107

68

12700

Φ50

50×50×6

580

100

74

6000

Φ80

80×80×8

/

60

75

1910

Φ100

100×100×10

/

55

78

1000

Note: the above list is the general type Carbon raschig ring, can also be customized according to customer’s request size of Carbon / graphite raschig ring.


Product detail pictures:

Short Lead Time for  Tower Packing  - Carbon & Graphite Raschig Ring for tower packing – Kelley detail pictures

Short Lead Time for  Tower Packing  - Carbon & Graphite Raschig Ring for tower packing – Kelley detail pictures

Short Lead Time for  Tower Packing  - Carbon & Graphite Raschig Ring for tower packing – Kelley detail pictures


Related Product Guide:

To be able to ideal satisfy client's requirements, all of our operations are strictly performed in line with our motto "High High-quality, Competitive Price tag, Fast Service" for Short Lead Time for Tower Packing - Carbon & Graphite Raschig Ring for tower packing – Kelley, The product will supply to all over the world, such as: Bandung, Brazil, Mombasa, Our company is working by the operation principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a friendly relationship with businessman from all over the world
  • We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Irma from Greece - 2018.10.01 14:14
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Eden from Costa Rica - 2018.09.21 11:44

    Related Products