A Leader In Mass Transfer Tower Packing Since 1988. - JIANGXI KELLEY CHEMICAL PACKING CO., LTD

Short Lead Time for Tower Packing - Carbon & Graphite Raschig Ring for tower packing – Kelley


Product Detail

Product Tags

Related Video

Feedback (2)

We believe in: Innovation is our soul and spirit. Quality is our life. Customer need is our God for Mass Transfer Pall Ring , Tri-Pak , Ceramic Ball Stock , Inspired by the rapid developing market of the fast food and beverage consumables all over the world , We are looking forward to working with partners/clients to make success together.
Short Lead Time for Tower Packing - Carbon & Graphite Raschig Ring for tower packing – Kelley Detail:

Application

Carbon / Graphite raschig ring packing main gas absorption, acidic gas desorption, washing and chemical fertilizer production, the actual application occasions, also as a filler in propane stripping tower and acid gas used in the absorber, such as ammonium, reforming furnace, the tower of petrochemical equipment, purification of the corrosive materials, absorption, condensation, distillation, evaporation, filtration, washing device used in industries such as strong corrosion.

Carbon/Graphite Raschig Ring Features

with low pressure drop, large flux, uniform liquid distribution, high mass transfer efficiency, absorption of a variety of tail gas or used in washing,gas separation, etc.It instead of a large number of black metal and various non-ferrous metals, is a kind of excellent corrosion resistance of non-metallic materials.

Component Content

Main content of our carbon Raschig ring:

ITEM

UNIT

VALUE

Carbon content

%

88-92

Solid hydrogen and oxygen

%

6-10

Ash content

%

1

Others

%

1

Technical Data

Size    (mm)

D*H*T              (mm)

Bulk Density     (KG/M3)

Surface Area        (m2/m3)

Voidage        (%)

Number
per m3    (Pcs/M3)         

Φ19

19×19×3

650

220

73

109122

Φ25

25×25×4.5

650

160

70

47675

Φ38

38×38×6

640

115

69

13700

Φ40

40×40×6

600

107

68

12700

Φ50

50×50×6

580

100

74

6000

Φ80

80×80×8

/

60

75

1910

Φ100

100×100×10

/

55

78

1000

Note: the above list is the general type Carbon raschig ring, can also be customized according to customer’s request size of Carbon / graphite raschig ring.


Product detail pictures:

Short Lead Time for  Tower Packing  - Carbon & Graphite Raschig Ring for tower packing – Kelley detail pictures

Short Lead Time for  Tower Packing  - Carbon & Graphite Raschig Ring for tower packing – Kelley detail pictures

Short Lead Time for  Tower Packing  - Carbon & Graphite Raschig Ring for tower packing – Kelley detail pictures


Related Product Guide:

Now we have highly developed devices. Our items are exported towards the USA, the UK and so on, enjoying a great popularity among the customers for Short Lead Time for Tower Packing - Carbon & Graphite Raschig Ring for tower packing – Kelley, The product will supply to all over the world, such as: Singapore, Atlanta, Denmark, We are looking forward to cooperating closely with you to our mutual benefits and top development. We guaranteed quality, if customers were not satisfied with the products' quality, you can return within 7days with their original states.
  • Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
    5 Stars By Alex from Kyrgyzstan - 2018.09.16 11:31
    The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Ivan from Czech Republic - 2017.02.18 15:54

    Related Products