A Leader In Mass Transfer Tower Packing Since 1988. - JIANGXI KELLEY CHEMICAL PACKING CO., LTD

New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley


Product Detail

Product Tags

Related Video

Feedback (2)

We always think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body and the living for Ss316 Rosette Ring , 304 Dxion Ring , Mesh Ring , We acquire high-quality as the foundation of our results. Thus, we focus over the manufacture on the finest top quality goods. A strict quality management system has been created to guarantee the caliber of the merchandise.
New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley Detail:

Application

Ceramic Super Intalox Saddle with excellent acid resistance and heat resistance. it is widely used in the scrubbing tower, dry tower, absorb tower, colling tower, those are used in chemical, metallurgical, gas, oxygen,medicine, acid, fertilizer and so on.

Technical Data

SiO2 + Al2O3 >92% CaO <1.0%
SiO2 >76% MgO <0.5%
Al2O3 >17% K2O+Na2O <3.5%
Fe2O3 <1.0% Other <1%

Physical & Chemical Properties

Water absorption <0.5% Moh’s hardness >6.5 scale
Porosity (%) <1 Acid resistance >99.6%
Specific gravity 2.3-2.40 g/cm3 Alkali resistance >85%
Max Operation temp 950~1100℃

Dimension And Other Physical Properties

Size

Thickness

(mm)

Specific Surface

(m2/m3)

Void Volume

(%)

Bulk Numbers

(Pcs/m3)

Package Density

(kg/m3)

25mm

3-3.5

160

78

53000

650

38mm

4-5

102

80

16000

600

50mm

5-6

88

80

7300

580

76mm

8.5-9.5

58

82

1800

550

Remark: 3Inch US size standard type are available,other size can be produced by customized.

Packaging & Shipping

Package Type

Container Load Capacity

20 GP

40 GP

40 HQ

Ton bag put on pallets

20-22m3

40-42 m3

40-44 m3

Plastic 25kg bags put on pallets           with film

20 m3

40 m3

40 m3

Plastic 25kg bags load into wooden case

20 m3

40 m3

40 m3

Delivery time

Within 7 working days (For common type)

10 working days  (For common type)

10 working days   (For common type)


Product detail pictures:

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures


Related Product Guide:

We usually keep on with the principle "Quality To start with, Prestige Supreme". We've been fully committed to offering our purchasers with competitively priced excellent solutions, prompt delivery and skilled support for New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley, The product will supply to all over the world, such as: Swiss, Kenya, Jamaica, Our company offers the full range from pre-sales to after-sales service, from product development to audit the use of maintenance, based on strong technical strength, superior product performance, reasonable prices and perfect service, we will continue to develop, to provide the high-quality products and services, and promote lasting cooperation with our customers, common development and create a better future.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Grace from Riyadh - 2017.11.29 11:09
    Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Phoenix from Chile - 2018.02.08 16:45

    Related Products