A Leader In Mass Transfer Tower Packing Since 1988. - JIANGXI KELLEY CHEMICAL PACKING CO., LTD

New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley


Product Detail

Product Tags

Related Video

Feedback (2)

Which has a positive and progressive attitude to customer's desire, our corporation constantly improves our merchandise quality to satisfy the desires of consumers and further focuses on safety, reliability, environmental demands, and innovation of Imtp Random Packing , Metallic Column Packing , Dixon Ring Column Packing , Our products have exported to North America, Europe, Japan, Korea, Australia, New Zealand, Russia and other countries. Looking forward to build up a good and long term cooperation with you in coming future!
New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley Detail:

Application

Ceramic Super Intalox Saddle with excellent acid resistance and heat resistance. it is widely used in the scrubbing tower, dry tower, absorb tower, colling tower, those are used in chemical, metallurgical, gas, oxygen,medicine, acid, fertilizer and so on.

Technical Data

SiO2 + Al2O3 >92% CaO <1.0%
SiO2 >76% MgO <0.5%
Al2O3 >17% K2O+Na2O <3.5%
Fe2O3 <1.0% Other <1%

Physical & Chemical Properties

Water absorption <0.5% Moh’s hardness >6.5 scale
Porosity (%) <1 Acid resistance >99.6%
Specific gravity 2.3-2.40 g/cm3 Alkali resistance >85%
Max Operation temp 950~1100℃

Dimension And Other Physical Properties

Size

Thickness

(mm)

Specific Surface

(m2/m3)

Void Volume

(%)

Bulk Numbers

(Pcs/m3)

Package Density

(kg/m3)

25mm

3-3.5

160

78

53000

650

38mm

4-5

102

80

16000

600

50mm

5-6

88

80

7300

580

76mm

8.5-9.5

58

82

1800

550

Remark: 3Inch US size standard type are available,other size can be produced by customized.

Packaging & Shipping

Package Type

Container Load Capacity

20 GP

40 GP

40 HQ

Ton bag put on pallets

20-22m3

40-42 m3

40-44 m3

Plastic 25kg bags put on pallets           with film

20 m3

40 m3

40 m3

Plastic 25kg bags load into wooden case

20 m3

40 m3

40 m3

Delivery time

Within 7 working days (For common type)

10 working days  (For common type)

10 working days   (For common type)


Product detail pictures:

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures

New Arrival China  Flue Gas Desulfurization  - Ceramic Super Intalox Saddle for tower packing – Kelley detail pictures


Related Product Guide:

Well-run devices, expert profits group, and better after-sales companies; We have been also a unified huge family, everybody keep on with the organization worth "unification, determination, tolerance" for New Arrival China Flue Gas Desulfurization - Ceramic Super Intalox Saddle for tower packing – Kelley, The product will supply to all over the world, such as: Slovenia, Cannes, Ghana, We can give our clients absolute advantages in product quality and cost control, and we have full range of molds from up to one hundred of factories. As product updating fast, we succeed in developing many high quality products for our clients and get high reputation.
  • We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Sara from Czech - 2018.09.23 17:37
    This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
    5 Stars By Cherry from Irish - 2018.05.22 12:13

    Related Products